1. Project Information: Details of the project including site address, client details, scope of scaffolding work, and project duration
2. Responsible Persons: List of key personnel including project manager, site supervisor, scaffolding supervisor, and safety officer with their contact details and responsibilities
3. Site Description: Detailed description of the work site, access points, ground conditions, and surrounding environment
4. Risk Assessment: Comprehensive assessment of all potential hazards, risk levels, and existing control measures
5. Control Measures: Detailed description of safety measures implemented to mitigate identified risks
6. Method Statement: Step-by-step procedure for scaffold erection, modification, and dismantling
7. Emergency Procedures: Emergency response plans, evacuation procedures, and emergency contact information
8. Equipment Requirements: List of required scaffolding equipment, tools, and PPE with specifications
9. Training Requirements: Required qualifications, certifications, and training for workers involved
10. Monitoring and Review: Procedures for regular inspections, maintenance, and documentation requirements
1. Environmental Management: Environmental protection measures when working in sensitive areas or adverse weather conditions
2. Traffic Management: Required for sites where scaffolding work affects public roads or pedestrian access
3. Noise Management: When scaffolding work is conducted in noise-sensitive areas or during restricted hours
4. Public Protection: Additional measures required when working in public areas or near occupied buildings
5. Special Access Requirements: For projects requiring unusual access methods or equipment
6. Temporary Works: When additional temporary structures or supports are required
1. Schedule A - Site Layout Plan: Detailed site plans showing scaffold locations, access points, and safety zones
2. Schedule B - Risk Assessment Matrix: Detailed risk assessment scores and methodology
3. Schedule C - Equipment Specifications: Technical specifications for all scaffolding components and equipment
4. Schedule D - Inspection Checklist: Daily and weekly scaffold inspection forms
5. Schedule E - Training Records: Copies of relevant training certificates and competency records
6. Schedule F - Emergency Contact List: Comprehensive list of emergency contacts and procedures
7. Appendix 1 - Technical Drawings: Detailed scaffold design drawings and calculations
8. Appendix 2 - Manufacturers' Guidelines: Relevant equipment manufacturer specifications and guidelines
9. Appendix 3 - Permits: Copies of relevant work permits and authorizations
10. Appendix 4 - Safety Data Sheets: SDS for any hazardous materials used in the scaffolding process
Find the document you need
Scaffold Risk Assessment And Method Statement
A New Zealand-compliant safety and methodology document for scaffolding works, combining risk assessment and detailed work procedures under NZ health and safety legislation.
Cleaning Risk Assessment And Method Statement
A New Zealand-compliant document that combines risk assessment and detailed methodology for safe cleaning operations, adhering to local health and safety regulations.
Method Statement For Demolition Of Concrete Slab
A technical document outlining procedures and safety requirements for concrete slab demolition under New Zealand health and safety regulations.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your data is private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it