51Ƶ

Construction Site Risk Assessment Template for Hong Kong

A comprehensive risk assessment document tailored for construction sites in Hong Kong, complying with the Occupational Safety and Health Ordinance (Cap. 509) and the Factories and Industrial Undertakings Ordinance (Cap. 59). This document provides a structured evaluation of potential hazards, risk levels, and control measures specific to construction activities. It incorporates Hong Kong's unique construction challenges, including high-rise building considerations, dense urban environment factors, and local weather conditions, while ensuring alignment with the Construction Sites (Safety) Regulations and other relevant local legislation.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Get template free

Your data doesn't train Genie's AI

You keep IP ownership of your docs

4.6 / 5
4.6 / 5
4.8 / 5

What is a Construction Site Risk Assessment?

The Construction Site Risk Assessment is a crucial document required under Hong Kong's workplace safety regulations, specifically designed to identify, evaluate, and mitigate potential hazards in construction projects. This document becomes necessary before commencing any significant construction work and must be regularly updated throughout the project lifecycle. It incorporates requirements from the Occupational Safety and Health Ordinance, Factories and Industrial Undertakings Ordinance, and various construction-specific regulations. The assessment covers all aspects of construction operations, from ground works to completion, including specific considerations for Hong Kong's unique construction environment such as typhoon risks and dense urban development challenges. It serves as both a legal compliance document and a practical tool for managing site safety, requiring input from various stakeholders and regular updates based on changing site conditions.

What sections should be included in a Construction Site Risk Assessment?

1. Document Control and Revision History: Details of the document version, date, approvers, and revision history

2. Executive Summary: Brief overview of the key risks identified and critical control measures

3. Project Information: Details of the construction site, project scope, and key stakeholders

4. Scope of Risk Assessment: Boundaries and limitations of the assessment, including activities covered

5. Methodology: Risk assessment approach, scoring criteria, and evaluation methods used

6. Site Description and Layout: Detailed description of the construction site, including site plans and surrounding environment

7. Construction Activities Assessment: Detailed assessment of risks associated with each major construction activity

8. Hazard Identification: Comprehensive list of identified hazards categorized by type

9. Risk Analysis and Evaluation: Assessment of likelihood and consequences of identified risks

10. Control Measures: Detailed preventive and mitigating measures for each identified risk

11. Emergency Response Procedures: Procedures for handling emergencies and incidents

12. Roles and Responsibilities: Definition of key roles and responsibilities in implementing risk controls

13. Monitoring and Review: Procedures for ongoing monitoring and periodic review of risk controls

What sections are optional to include in a Construction Site Risk Assessment?

1. Specialized Equipment Risk Assessment: Detailed assessment for specific high-risk equipment, used when project involves specialized machinery

2. Environmental Impact Assessment: Assessment of environmental risks, required for projects with significant environmental impact

3. Public Safety Assessment: Assessment of risks to public safety, required for sites near public areas

4. Underground Works Assessment: Specific assessment for underground construction activities, required for projects involving tunneling or basement works

5. High-Rise Construction Assessment: Additional assessment for tall building construction risks, required for high-rise projects

6. Demolition Works Assessment: Specific assessment for demolition activities, required when project involves demolition

7. Confined Space Assessment: Assessment for work in confined spaces, required when such work is planned

What schedules should be included in a Construction Site Risk Assessment?

1. Schedule A - Risk Assessment Matrix: Detailed risk assessment scoring matrix and criteria

2. Schedule B - Site Layout Plans: Detailed site plans showing work areas, access points, and safety features

3. Schedule C - Control Measure Checklist: Comprehensive checklist of all control measures and their implementation status

4. Schedule D - Emergency Contact Information: List of emergency contacts and response team members

5. Appendix 1 - Risk Assessment Forms: Blank and completed risk assessment forms

6. Appendix 2 - Safety Equipment Specifications: Details of required safety equipment and PPE

7. Appendix 3 - Relevant Certificates and Permits: Copies of necessary safety certificates and work permits

8. Appendix 4 - Training Records: Records of safety training and competency assessments

9. Appendix 5 - Incident Reporting Forms: Templates for incident reporting and investigation

Authors

Alex Denne

Head of Growth (Open Source Law) @ Genie AI | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents

Jurisdiction

Hong Kong

Publisher

Genie AI

Document Type

Statement of Work

Cost

Free to use

Find the exact document you need

SOW Addendum

A Hong Kong law-governed document that modifies or supplements an existing Statement of Work, updating key terms while maintaining the original agreement's framework.

Download

Employment Compromise Agreement

A Hong Kong law-governed agreement documenting employment separation terms and mutual settlement between employer and employee.

Download

Construction Site Risk Assessment

A comprehensive construction site risk assessment document aligned with Hong Kong safety regulations and construction industry requirements.

Download

SOW For Software Development

A Hong Kong law-governed contract defining the scope, deliverables, and terms for software development services between a service provider and client.

Download

SOW Amendment

A Hong Kong law-governed document that formally modifies an existing Statement of Work, detailing changes to scope, deliverables, or terms.

Download

SOW

A Hong Kong-governed Statement of Work defining specific project deliverables, timelines, and commercial terms between contracting parties.

Download

Scope Of Work

A Hong Kong law-governed document that defines the specific work, deliverables, and performance standards for a project or service engagement.

Download

Software Sales Contract

A Hong Kong law-governed agreement for software sales and licensing, defining terms between vendor and purchaser.

Download

Employment Confidentiality Agreement

Hong Kong-governed agreement establishing employee confidentiality obligations and protecting company's confidential information.

Download

Sourcing Fee Agreement

A Hong Kong law-governed agreement setting out terms and fee arrangements for sourcing services between a sourcing agent and client company.

Download

Scholarship Recommendation Letter From Friend

A formal personal recommendation letter used in Hong Kong's educational system to support scholarship applications by providing character references and personal insights about the candidate from a friend's perspective.

Download

Consulting Referral Fee Agreement

A Hong Kong law-governed agreement establishing terms and conditions for referral fee arrangements between consulting or professional service providers.

Download

Website Privacy Notice

A legal document required under Hong Kong's PDPO that explains how a website collects and handles personal data of its users.

Download

Consulting Services Agreement

A Hong Kong law-governed agreement setting out terms and conditions for the provision of consulting services, including scope, payment, and key obligations of both parties.

Download

Statement Of Work Contract

A Hong Kong law-governed contract defining specific project deliverables, timelines, and payment terms between service provider and client.

Download

Employment Settlement Agreement

A Hong Kong-governed agreement that documents the mutually agreed terms for settling and terminating an employment relationship.

Download

Master Service Agreement

A Hong Kong law-governed framework agreement establishing general terms for ongoing service provision between a service provider and customer.

Download
See more related templates

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it